6.03 Instrument Approach

6.1.3 Instrument Approach

01. Maximum 5 Segments

As required by local conditions an instrument approach procedure may be designed to consist of a maximum of 5 phases or — as ICAO defines it — segments. The following table indicates where these segments can be found.

Training reference only. Always defer to current approved manuals and official procedures.

Approach segment table

SEGMENTBEGINS AT
1. ArrivalAirway
2. InitialInitial Approach fix (IAF)
3. IntermediateIntermediate approach fix (IF)
4. Final (Precision appr)Final approach point (FAP = GP intercept)
Final (Non-precision appr)Final Approach Fix (FAF)*
5. Missed approach (Precision appr)Reaching DA or DH
Missed approach (Non-precision appr)Published missed Approach point (MAPt)

Typical approach

A typical approach would look like this:

Typical instrument approach showing arrival, initial, intermediate, final and missed approach segments
Typical instrument approach segments

Note on FAF

If the facility providing track guidance is located at the aerodrome and if the FAF can not be suitably fixed (e.g. single NDB approach) ICAO assumes the final approach segment to begin as soon as the aircraft is established on the final approach track.

02. Survey of the Operational Limitations for Each Approach Segment

For each approach segment operational limitations have been established. They have all been discussed in the paragraphs before. On the following page you will find a chart of a typical ILS (Precision approach) and a Non-precision approach procedure.

It is a survey of the combination of approach segments and limitations.